Studio 60 on the Sunset Strip is the greatest television program of all time. (This is a skit, sorry, sketch, sorry, lie).
Studio 60 on the Sunset Strip is the greatest television program of all time. (This is a skit, sorry, sketch, sorry, lie).
Six Dettmar joins us this season from Scanline Media!
Music used in this episode includes "Klepotonic Swing" by Tri-Tachyon.
Email: chatzpod@gmail.com
Our main podcast feed art was done by Camilla Franklin, whose work can be found at https://camillafranklin.myportfolio.com/